We attended the site to find a concrete slab and a small hole. With pearing into the small hole we were a little concerned to find half the floor surrounding the area had been undermined and was no longer supporting anything. This included a corner of the building. First thing was to remove the concrete
Finally got through the foot thick concrete which had been sat on top of the well for many years. It was great to see the wood still in place and the rsj’s looking in good shape. The well is flint lined and and is almost 40 meters deep. It looks in fantastic condition.
Today we will reveal a well that has laid hidden for many years and covered with concrete. The concrete is almost 1 foot thick. The well is flint lined and 40 meters deep. We will be doing a video inspection once we have uncovered the well. Once all is complete we will be installing water